The FEED phase is the most critical time for controlling costs, optimizing the design and confirming the project execution strategy. Early application of our expertise at this stage minimizes delays, reduces risk and lowers costs. When preparing for conceptual design work or budgetary evaluations gather the data necessary for optimized production and processing decision making.
- Piping and Flow Diagrams
- Simulations
- Overall Concept development
CROFT's Front-End Engineering Design focuses on technical requirements and identifying the main costs for a proposed project.
We use FEED to establish a price for the execution phase of the project and evaluate potential risks. This package is used as the basis for bidding the execution phase contracts and is used as a design basis. With extensive experience in engineering, Croft understands the best level of detail required for a FEED to allow successful project delivery.
Project Scope
- 2D and 3D Preliminary Models
- Equipment Layout and Installation Plan
- Major Equipment List
- Automation Strategy